4 Boehringer Mannheim (India) Ltd
4 Colgate-Palmolive (India) Ltd. at Baddi, Himachal Pradesh
4 D. Y. Patil Education Society
4 Esvee Pharmeceuticals Pvt. Ltd
4 Hindustan Lever Ltd at Uttranchal
4 Ruby Hall Clinic, Pune
4 Sewa Medicals Ltd
4 USV Ltd
4 Zydus Byk HeathCare Ltd
 

Factory Building of M/s. Colgate-Palmolive (India) Ltd. at Baddi (Himachal Pradesh).

This Buidling was constructed in the year 2003 - 2004 at a cost of INR. 230.00 Million (including cost of material) and was completed in a period of 12 months.
 
© 2008 ROHAN. All rights reserved.